GreenGen
![]() | This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
GreenGen | |
---|---|
Country | China |
Location | Tianjin |
Status | Under construction |
Construction began | 2009 |
Commission date | 2012 |
Owners | China Huaneng Group China Datang Group China Huadian Corporation China Guodian Corporation China Power Investment Corporation Shenhua Group State Development and Investment Co. China Coal Group Peabody Energy |
Operator | China Huaneng Group |
Thermal power station | |
Primary fuel | Coal |
Combined cycle? | Yes |
Power generation | |
Nameplate capacity | 250 MW |
GreenGen (Chinese: 绿色煤电; pinyin: lǜsèméidiàn; lit. 'green colour coal electricity') is a project in Tianjin, China that aims to research and develop high-tech low-emissions coal-based power generation plants.
Motivation
[edit]China's primary energy source is coal. To drive toward more sustainable energy, scientists wanted to develop new energy technology.
International agreements will be stricter regarding CO2 emissions, so the GreenGen project is meant to produce energy with very small emissions. The project will use coal gasification to produce both hydrogen and electric power.
China will become a more energy-efficent nation from the project while reducing greenhouse gas emissions.
History
[edit]The GreenGen project was initiated in 2004 by the China Huaneng Group (CHNG)[1]. The project has underwent a three-stage development process. The GreenGen Ltd. Co. China was founded in 2005 by CHNG, China Datang Group, China Huadian Corporation, China Guodian Corporation, China Power Investment Corporation, Shenhua Group, State Development & Investment Co., and the China Coal Group.[2]
Lingang Industrial Park was selected as the site for the plant. This site was chosen for its close range to chemical facilities to optimize GreenGen's byproducts. The CO2 created from the project will go to other projects in the industrial park.[3]
Beginning in 2009, Phase 1 focused on building and mastering the 250 MW integrated gasification combined cycle (IGCC), which is a coal gasification process that turns coal into a gas before burning it, hence allowing power generation to be more efficient and releasing less carbon and other pollutants. The plant was scheduled to start operating in 2012 but this got delayed until 2012.[4] The second phase began in 2014. It uses fuel cells and turbines for electricity generation and converts CO2 to industrial use.[5] The third phase built a 400 MW demonstration plant, integrating the key technologies from the previous phases while aiming to have minimum emissions.
In 2007, the project was joined by Peabody Energy, the world's largest private sector coal company.
The GreenGen IGCC plant was completed by 2012. As of 2020,it is the only remaining IGCC plant operating in China. The efforts of the plant were a result of China's research efforts to master the technology since the 1980s. It's completion is a marker of a scale-up period.[1] The project has also been important in international collaboration for clean energy. While seeking collaboration with China's National Energy Administration to enhance the Texas Clean Energy Project (TCEP), the U.S Department of Energy partnered with CHNG, which involved leveraging the experience gained from the GreenGen project.[5]
Project
[edit]The GreenGen IGCC plant is composed of the following main components: a coal gasifier, an air separation unit, a syngas purification system, a methyldiethanolamine sulfur removal system, and a power block which has a gas turbine generator, a steam turbine generator, and a heat recovery steam generator. The Huaneng Clean Energy Research Institute designed the coal gasifier. The air separation unit is able to produce liquid oxygen, nitrogen, and argon.[1]
The coal gasification works through a 2000 tonnes/day gasifier that converts coal into a mixture of carbon monized and hydrogen (also known as syngas). High-purity oxygen in a water wall-cooled system is essential to keep this part of the process functioning. Up to 99% of the oxygen reacts with the coal to produce syngas.
The gas cleaning system removes impurities from the syngas and ensures reduced emissions (impurities includes particular matter, sulfur compounds, and other contaminants). This is a two step process involving dry and wet removal techniques. The gas cleaning section is located between the gasification system and combine-cycle power block.[1]
Finally, the combined-cycle power block is the key component that integrates a gas and steam turbine to maximize power generation. The core gas turbine burns syngas and combusts it to generate electricity. Exhaust gases are taken to a Heat Recovery Steam Generator (HRSG) which captures waste heat. Steam steam produced in this process is sent to the steam turbine. Additional electricity is generated here using heat recovered from the gas turbine.[1]
The entire process significantly improves the efficiency of the plant (41% when Shenhua coal is used).[4]
See also
[edit]References
[edit]- ^ a b c d e Xia, Changyou; Ye, Bin; Jiang, Jingjing; Shu, Yutong (2020-10-20). "Prospect of near-zero-emission IGCC power plants to decarbonize coal-fired power generation in China: Implications from the GreenGen project". Journal of Cleaner Production. 271: 122615. doi:10.1016/j.jclepro.2020.122615. ISSN 0959-6526.
- ^ "Peabody Energy Joins China's 'GreenGen' project". Carbon Capture Journal. February 1, 2025.
- ^ Zheng, Song. "GreenGen Project: Update and Outlook" (PDF).
- ^ a b Weido, Ni (September 2014). "Developing High-Efficiency, Low-Carbon, Clean Coal in China" (PDF). Cornerstone, The Official Journal of the World Coal Industry.
- ^ a b Hetland, Jens; Zheng, Li; Shisen, Xu (2009-02-01). "How polygeneration schemes may develop under an advanced clean fossil fuel strategy under a joint sino-European initiative". Applied Energy. IGEC III. 86 (2): 219–229. doi:10.1016/j.apenergy.2008.03.010. ISSN 0306-2619.
External links
[edit]